PUMPING THE DEWAR
-
Attach DEWAR to system.!! DO NOT OPEN CAVITY to VACUUM LINES YET!!
-
Move front panel switch to START. The roughing pump now evacuates the test
port.
-
When vacuum lines are down to about 5mTor (testport pressure indicator),
wait about 5 minutes and open dewar to detector cavity valve to pump out
gases.
-
If you want to make some leak test, this is the right time (Cf. Leak
detection ).
-
Pump on detector cavity for few hours. !! DO NOT LEAVE PUMP UNATTENDED,
since power outage will allow detector cavity to gain pressure and gases.
-
Close the valve of the dewar.
-
Front switch: RESET, VENT.
-
Disconnect Dewar from the pump and pour liquid nitrogen into it.