START-UP PROCEDURE FOR THE PUMP
AND THE LEAK DETECTOR


Last update: 2002
    Before plugging in the pump, set the following controls to the initial position indicated below.

  Right Front corner of stainless steel

Top START/VENT RESET

Control Panel

LEAK OFF
FILAMENT ON/OFF  OFF
GROSS LEAK TEST OFF
TRANSFER PRESSURE HOLD
PUMPS (ROUGH, FORE, DIFF) OFF (DOWN)
ELECTRONICS OFF
PUMPING MODE SERVICE PUMP

Pump Leak Indicator Panel

THRESHOLD FULL COUNTER CLOCK WISE (CCW)
VOLUME FULL CCW

 

Back to Instrument Subsystem Page