SHUT DOWN THE PUMP
-
Make sure that :
The valve of the dewar is
closed.
Front switch : RESET, VENT.
DEWAR is disconnected from
the pump. Close the pump tube.
Front switch : RESET.
-
Set the following controls to the initial position indicated below :
ELECTRONICS |
OFF |
DIFFUSION PUMP |
OFF |
PUMPING MODE SERVICE |
VENT |
-
Remove cold trap by pouring any residual liquid nitrogen.
-
Make sure that the pump tube is closed.
-
Turn the PUMPING MODE switch to the SERVICE PUMP position and wait until
the TESTPORT PRESSURE meter shows 5 to 10 mTorr.
-
Set the Rough circuit breaker to off.
-
Wait 20 minutes and then turn off the FORE PUMP circuit breaker.
-
Unplug the pump.
Back to Instrument Subsystems Page