DATE MOON INST OBSERVER PI AND PROGRAM
MAY 1 SUN 0.56 FAST Berlind Huchra Fast Combo
MAY 2 MON 0.49 " Peters " " "
MAY 3 TUE 0.42 " " " " "
MAY 4 WED 0.35 " " " " "
MAY 5 THR 0.29 " Berlind " " "
MAY 6 FRI 0.22 " " " " "
MAY 7 SAT 0.15 " " " " "
MAY 8 SUN 0.08 " Peters " " "
MAY 9 MON 0.01 " " " " "
MAY 10 TUE 0.05 " " " " "
MAY 11 WED 0.12 " Berlind " " "
MAY 12 THR 0.19 " " " " "
MAY 13 FRI 0.26 " " " " "
MAY 14 SAT 0.32 " Muscarella " " "
MAY 15 SUN 0.39 " " " " "
MAY 16 MON 0.46 " " " " "
MAY 17 TUE 0.53 " Peters " " "
MAY 18 WED 0.59 " " " " "
MAY 19 THR 0.66 Ech " Latham Echelle Combo
MAY 20 FRI 0.73 " Berlind " " "
MAY 21 SAT 0.80 " " " " "
MAY 22 SUN 0.87 " " " " "
MAY 23 MON 0.93 " Peters " " "
MAY 24 TUE 1.00 " " " " "
MAY 25 WED 0.93 AFOE Noyes Noyes Asteroseismology
MAY 26 THR 0.86 " " " " "
MAY 27 FRI 0.80 " " " " "
MAY 28 SAT 0.73 " " " " "
MAY 29 SUN 0.66 " " " " "
MAY 30 MON 0.59 " " " " "
MAY 31 TUE 0.52 FAST Peters Huchra FAST Combo
FAST Combo is Proposal #1 Huchra Redshift, #2 Kirshner SN, #3
Geller 15R Survey, #5 Hazenberg 3c273 Survey, #12 Kenyon
Symbiotics, #14 Dell'Antonio Rosat Groups, #16 Wilkes, ROSAT
Quasars, #17 Huchra Warpfire clusters, #19 Stauffer Clouds,
and #20 Prosser IC4665. The breakdown of time between these
projects is given roughly by the allocations at the end.
Echelle Combo is proposals #101 Latham Halo Binaries, #103 Latham
G Dwarf Binaries, #111 Stefanik Overshooting, #112 Stefanik
X-ray Binaries, #113 Stefanik F Stars, #121 Kenyon, Symbiotics,
#131 Milone, Blue Stragglers, #141 Dupree Supergiants, and #151
Prosser IC4665 Again, the breakdown of time should be roughly
as in the allocations at the end.
*** MOON is Moon phase at middle of night
*** DATE is Standard Time at start of night
Tillinghast Schedule for the Month of June 1994
April
May June
July August
September
Programs
Schedules
DATE MOON INST OBSERVER PI AND PROGRAM
JUNE 1 WED 0.46 FAST Hazenberg Huchra FAST Combo
JUNE 2 THR 0.39 " " " " "
JUNE 3 FRI 0.32 " " " " "
JUNE 4 SAT 0.25 " " " " "
JUNE 5 SUN 0.19 " " " " "
JUNE 6 MON 0.12 " Berlind " " "
JUNE 7 TUE 0.05 " " " " "
JUNE 8 WED 0.02 " " " " "
JUNE 9 THR 0.08 " Peters " " "
JUNE 10 FRI 0.15 " " " " "
JUNE 11 SAT 0.22 " " " " "
JUNE 12 SUN 0.29 " Berlind " " "
JUNE 13 MON 0.36 " " " " "
JUNE 14 TUE 0.42 " " " " "
JUNE 15 WED 0.49 " Peters " " "
JUNE 16 THR 0.56 " " " " "
JUNE 17 FRI 0.63 Ech " Latham Echelle Combo
JUNE 18 SAT 0.69 " Berlind " " "
JUNE 19 SUN 0.76 " " " " "
JUNE 20 MON 0.83 " " " " "
JUNE 21 TUE 0.90 " Peters+Muscarella " "
JUNE 22 WED 0.97 " " " " "
JUNE 23 THR 0.97 " Muscarella " " "
JUNE 24 FRI 0.90 " Berlind " " "
JUNE 25 SAT 0.83 " " " " "
JUNE 26 SUN 0.76 " " " " "
JUNE 27 MON 0.70 " Muscarella " " "
JUNE 28 TUE 0.63 " " " " "
JUNE 29 WED 0.56 FAST Callanan+Muscarella Callanan #15 LMXBs
JUNE 30 THR 0.49 " Callanan " " "
FAST Combo is Proposal #1 Huchra Redshift, #2 Kirshner SN, #3
Geller 15R Survey, #5 Hazenberg 3c273 Survey, #12 Kenyon
Symbiotics, #14 Dell'Antonio Rosat Groups, #16 Wilkes, ROSAT
Quasars, #17 Huchra Warpfire clusters, #19 Stauffer Clouds,
and #20 Prosser IC4665. The breakdown of time between these
projects is given roughly by the allocations at the end.
SS0019+21 should be observed for McClintock at the end of the
night, if possible.
Echelle Combo is proposals #101 Latham Halo Binaries, #103 Latham
G Dwarf Binaries, #111 Stefanik Overshooting, #112 Stefanik
X-ray Binaries, #113 Stefanik F Stars, #121 Kenyon, Symbiotics,
#131 Milone, Blue Stragglers, #141 Dupree Supergiants, and #151
Prosser IC4665 Again, the breakdown of time should be roughly
as in the allocations at the end.
Note: Berlind to observe June 2 at the MMT.
*** MOON is Moon phase at middle of night
*** DATE is Standard Time at start of night
Tillinghast Schedule for the Month of July 1994
April
May June
July August
September
Programs
Schedules
DATE MOON INST OBSERVER PI AND PROGRAM
JULY 1 FRI 0.43 FAST Callanan Callanan #15 LMXBs
JULY 2 SAT 0.36 " " " " "
JULY 3 SUN 0.29 " Peters Huchra FAST Combo
JULY 4 MON 0.22 " " " " "
JULY 5 TUE 0.15 " " " " "
JULY 6 WED 0.09 " Berlind " " "
JULY 7 THR 0.02 " " " " "
JULY 8 FRI 0.05 " " " " "
JULY 9 SAT 0.12 " Peters " " "
JULY 10 SUN 0.18 " " " " "
JULY 11 MON 0.25 " " " " "
JULY 12 TUE 0.32 " Berlind " " "
JULY 13 WED 0.39 " " " " "
JULY 14 THR 0.46 FAST Curiel+Berlind Curiel #18 Shocks
JULY 15 FRI 0.52 " Curiel " " "
JULY 16 SAT 0.59 " " " " "
JULY 17 SUN 0.66 " " " " "
JULY 18 MON 0.73 AFOE Noyes Noyes Asteroseismology
JULY 19 TUE 0.79 " " " " "
JULY 20 WED 0.86 " " " " "
JULY 21 THR 0.93 " " " " "
JULY 22 FRI 1.00 Ech Berlind Latham Echelle Combo
JULY 23 SAT 0.94 " " " " "
JULY 24 SUN 0.87 " " " " "
JULY 25 MON 0.80 " Peters " " "
JULY 26 TUE 0.73 " " " " "
JULY 27 WED 0.66 " " " " "
JULY 28 THR 0.60 " Muscarella " " "
JULY 29 FRI 0.53 " " " " "
JULY 30 SAT 0.46 " " " " "
JULY 31 SUN 0.39 " Berlind " " "
FAST Combo is Proposal #1 Huchra Redshift, #2 Kirshner SN, #3
Geller 15R Survey, #5 Hazenberg 3c273 Survey, #12 Kenyon
Symbiotics, #14 Dell'Antonio Rosat Groups, #16 Wilkes, ROSAT
Quasars, #17 Huchra Warpfire clusters, #19 Stauffer Clouds,
and #20 Prosser IC4665. The breakdown of time between these
projects is given roughly by the allocations at the end.
SS0019+21 should be observed for McClintock at the end of the
night.
Echelle Combo is proposals #101 Latham Halo Binaries, #103 Latham
G Dwarf Binaries, #111 Stefanik Overshooting, #112 Stefanik
X-ray Binaries, #113 Stefanik F Stars, #121 Kenyon, Symbiotics,
#131 Milone, Blue Stragglers, #141 Dupree Supergiants, and #151
Prosser IC4665 Again, the breakdown of time should be roughly
as in the allocations at the end.
*** MOON is Moon phase at middle of night
*** DATE is Standard Time at start of night
Tillinghast Schedule for the Month of August 1996
April
May June
July August
September
Programs
Schedules
DATE MOON INST OBSERVER PI AND PROGRAM
AUG 1 MON 0.33 -------- Summer Shutdown ----------------
AUG 2 TUE 0.26 " " " " "
AUG 3 WED 0.19 " " " " "
AUG 4 THR 0.12 " " " " "
AUG 5 FRI 0.05 " " " " "
AUG 6 SAT 0.01 " " " " "
AUG 7 SUN 0.08 " " " " "
AUG 8 MON 0.15 " " " " "
AUG 9 TUE 0.22 " " " " "
AUG 10 WED 0.28 " " " " "
AUG 11 THR 0.35 " " " " "
AUG 12 FRI 0.42 " " " " "
AUG 13 SAT 0.49 " " " " "
AUG 14 SUN 0.55 " " " " "
AUG 15 MON 0.62 " " " " "
AUG 16 TUE 0.69 " " " " "
AUG 17 WED 0.76 " " " " "
AUG 18 THR 0.83 " " " " "
AUG 19 FRI 0.89 " " " " "
AUG 20 SAT 0.96 " " " " "
AUG 21 SUN 0.97 " " " " "
AUG 22 MON 0.90 " " " " "
AUG 23 TUE 0.84 " " " " "
AUG 24 WED 0.77 " " " " "
AUG 25 THR 0.70 " " " " "
AUG 26 FRI 0.63 " " " " "
AUG 27 SAT 0.56 " " " " "
AUG 28 SUN 0.50 " " " " "
AUG 29 MON 0.43 " " " " "
AUG 30 TUE 0.36 " " " " "
AUG 31 WED 0.29 " " " " "
*** MOON is Moon phase at middle of night
*** DATE is Standard Time at start of night
Tillinghast Proposal Summary May-July 1994
April
May June
July August
September
Programs
Schedules
Prop. P.I. Title Inst. Request Award Grade
________________________________________________________________________-_____
13 McClintock SS0019+21 FAST 1D 1D 1.25
2 Kirshner SN Spectroscopy FAST 5D 5D 1.22
12 Kenyon Symbiotic Star Evolution FAST 1G 1G 0.90
3 Geller 15-R Redshift Survey FAST 12D 10DD 0.89
161 Noyes AFOE Seismology AFOE 14L 10L 0.86
18 Curiel Astrophysical Shocks FAST 4D 4G 0.79
1 Huchra CfA Redshift Survey FAST 16D+8G 12D+5.5G 0.72
5 Hazenberg 3C273 LOS Galaxies FAST 6D 6D 0.72
121 Kenyon Symbiotics Ech 2L 2L 0.63
15 Callanan LMXB Spectroscopy FAST 4G 4G 0.39
14 Dell'Antonio ROSAT Groups FAST 1/2D 1/2D 0.06
19 Stauffer Translucent Clouds FAST 3G 3G 0.05
141 Dupree High Latitude Supergiants Ech 4L 4L 0.04
101 Latham Halo Binaries Ech 20L 7L -0.04
16 Wilkes ROSAT Quasars FAST 1G 1G -0.10
131 Milone Blue Stragglers Ech 4L 4L -0.23
17 Huchra Warpfire II Redshifts FAST 2D 2D -0.35
20 Prosser IC4665 Spectral Types FAST 2G 2G -0.68
103 Latham G Dwarf Binaries Ech 5L 4L -0.73
112 Stefanik Xray Binaries Ech 3L 3L -0.77
151 Prosser IC4665 Binaries Ech 1L 1L -1.01
102 Latham M67 Binaries Ech 5x1/3L ---- -1.04
111 Stefanik Overshooting Ech 2L 2L -1.04
113 Stefanik NGP F Stars Ech 3L 1L -1.31
______________________________________________________________________________
Total Requested: 46.5 D + 19 G + 60 L (125.5 nights)
Total Available: 55 D/G + 37 L
Observing guidelines for Remote Observers on FAST Programs:
The highest priority programs will continue to be the redshift survey
programs --- #1, #3 and #5. This trimester the break should be fractionally
about 2/3 of the time to the ordinary cfA survey with a special emphasis on
finishing the region around 3C273 to a limiting magnitude of 15.5 and
about 1/3 of the time on the 15R survey objects. In the survey time
include the few observations needed for Dell'Antonio, Kenyon, Wilkes
and Kirshner as well as Prosser and the "Warpfire" cluster project.
Bright objects for Prosser, Stauffer, Kenyon etc. should be done preferentially
in grey time, twilight or on photometric conditions. The frequency of SN
observations for Kirshner should continue on the same rules as before:
yound SN should be observed frequently, older but still bright SN should be
observed at a frequency of about 1/3 - 1/4 of their age. A rule of thumb
for the Warpfire objects might be to spend 1 night per run on them. They'll
require a narrow slit and high S/N observations.
J. Huchra
April 1994